Photos of Frank-T Feeder vessel

Exit Gallery

16.8.10 Construction 14.9.10 Construction 21.9.10 Construction 26.10.10 Construction 5.11.10 Nearing Completion 13.12.10 Sea trials 26.1.11 Arrival
26.1.11 Arrival 26.1.11 Arrival 28.1.11 29.4.11 Naming Ceremony 08.07.11  Frank-T In operation at the Outer Harbour with Skipper Tony Ford Frankj-T on route to Outer Harbour
Frank-T loading at the quayside Feb 2012 snow on the <i>Frank-T</i> <i>Frank-T</i> fully loaded with equipment <i>Frank-T</i> supplying to the wind farm support vessels at night Generators onboard the <i>Frank-T</i> Sunrise 29th August 2012 Lifting engines for Island Shipping
Nov 2012 Loading the vessel at the quay

Exit Gallery

 

Copyright Notice
Unless specifically indicated otherwise, all text and images on these gallery pages and the Wells Harbour website are the copyright of Wells Harbour or of their individual copyright holders and are used here with permission. These images may not be downloaded, copied, posted, printed or reproduced elsewhere on-line or in print or in any other form without specific prior written permission from Wells Harbour or the relevant copyright holder.